Dear Sir/Madam,
Examinations on Controls over Information
Technology (IT) Problem and System Change Management
The Hong Kong Monetary Authority (HKMA) has recently completed a
round of on-site examinations of selected authorized institutions
(AIs) on their controls over IT problem and system change
management. The examination results indicate that there are rooms
for improvement in respect of certain aspects of the controls over
IT incident management and implementation of emergency system
changes by the examined AIs.
Specifically, our examinations found inadequacy in the process
of reporting, risk assessment, escalation and rectification of IT
problems. For instance, some AIs have underestimated the risk
implications or incorrectly categorised the severity of certain
reported IT incidents. As a consequence, lower priority and
insufficient resources have been assigned for identifying and
rectifying the root cause of these IT incidents, which is intended
for preventing the incidents from recurring or evolving into a
major system disruption incident. In addition, control weaknesses
are identified in relation to the implementation of emergency
changes to production systems and IT infrastructure. Some emergency
system changes are not supported by formal documentation, and
access to and use of high-privilege user and system IDs are not
adequately controlled. These control weaknesses will obviously
increase the risk of unauthorised access to the production system
environment and thus the chance of system disruptions.
To help the banking sector improve the controls over IT problem
and system change management, I set out in Annex
1 and Annex 2 respectively for your
reference a list of major common issues and some good practices
adopted by the examined AIs. I would also like to take this
opportunity to remind your institution of the need to regularly
assess the adequacy of the IT problem and system change controls
within your operating environment.
Should you have any questions about the content of this
circular, please contact Mr. Shu-pui Li at 2878-1826 or Mr. Nelson
Chow at 2878-1470.
Yours faithfully,
Arthur Yuen
Executive Director
(Banking Supervision)
Annex 1 - Common Controls Issues Identified
Reporting, risk assessment, escalation and management of
IT problems
Delays in IT problem resolution and
recurring of incidents
- Delays in replacing a faulty system component have finally
caused a major system disruption incident.
- Although some reported IT incidents are found to have affected
the customer services such as outages of the ATM and phone banking
services, these incidents are only assigned with a low severity
level. It resulted in delays of problem resolution.
- A number of recurring IT incidents are believed to be caused by
insufficient testing before system implementation.
Misleading problem trend analysis
reports
- Misclassification of problem severity of (e.g. lower severity
level assigned to severe incidents), and wrong root causes being
identified for, IT problems resulting in possible misleading
outcome of problem trend analysis.
- Some AIs do not adopt automated tools for IT problem reporting
and management. In some cases, the problem records are manually
maintained and resulted in incomplete records.
System change requests and implementation
Inappropriate timing for scheduled changes
to critical systems
- A few AIs sometimes implement scheduled changes to critical
systems and infrastructure close to the commencement of business
hours. Such arrangements increase the risk of system disruptions to
the production environment during business hours.
Handling of high-privilege IDs for change
implementation
- A few AIs do not monitor and review the usage of high-privilege
user and/or system IDs, particularly after change implementation.
In addition, access attempts to firewalls performed by IT support
staff have not been reviewed. As a result, unauthorised changes
and/or errors made during routine maintenance work to critical
network infrastructure might not be detected promptly.
Inadequate emergency change request
process
- A number of AIs have implemented emergency changes to the
production systems without the support of any valid and/or approved
problem tickets.
Annex 2 - Good practices adopted by certain
AIs
Senior management oversight
- Several AIs produce regular and good quality problem statistics
and trend analysis reports (including categorisation and detailed
root cause analysis of the incidents) for review by the senior
management.
- A number of AIs have established a dedicated change management
committee or function to review and prioritise system and
infrastructure change requests. Such dedicated functions help
ensure that scheduled changes are properly managed, prioritised and
approved, and sufficient resources are allocated to the change
requests.
Reporting, escalation and management of IT
problems
- All AIs examined have established a designated incident
response team and structure to oversee the problem management
process.
- A few AIs have developed a set of comprehensive procedures for
problem reporting and escalation, including a mechanism for
assessing the need to report the incidents to relevant
authorities.
Scheduled system change requests and
implementation
- A few AIs have established "Change Windows" (i.e. the periods
of time that changes to production systems are allowed to be made)
for individual systems which are mutually agreed between the IT
department and business users. The "Change Windows" for high-risk
changes are required to be allocated to non-business days (e.g.
weekends / long weekends) and long before commencement of business
hours to allow sufficient time for fallback implementation if
required.
- Some AIs have implemented an effective network monitoring and
management system to record and monitor user activities and system
changes to network equipment to ensure timely detection of
unauthorised changes.
- A few AIs have implemented a remote console system that enables
IT support staff to have direct logical access to the production
system and infrastructure to facilitate problem troubleshooting,
and implementation of emergency changes. The remote console system
avoids the need of IT support staff to enter the data centre
physically. The system is installed in a secured room and access to
the system is restricted to authorized staff only. Audit trails of
access to the production systems and infrastructure are also
maintained.
Emergency change requests and
implementation
- Some AIs have established a stringent emergency system change
policy that requires all emergency changes be substantiated with a
valid problem ticket and proper approval. The AIs concerned also
conduct regular post-implementation reviews to facilitate timely
detection of unauthorised changes and to identify any policy
non-compliance issues.
Others
- A number of AIs have implemented automated systems for problem
and change management (e.g. problem assignment, approval process
and status monitoring).
- A few AIs have implemented automated systems for managing
password assignment and reset of high-privilege users' and systems'
passwords to facilitate monitoring of their usages in particular
for problem troubleshooting or change implementation.